State of Ohio
PUBLIC WORKS COMMISSION
OPWC Advisories - Infrastructure Programs

This material serves to replace previously issued advisories as well as describe select statutory provisions in the Ohio Revised Code (ORC) and administrative rules in the Ohio Administrative Code (OAC). If applicable, topics include ORC and/or OAC linked references as well as linked websites to obtain more information. Use Ctrl + F to search by key word.

    Americans with Disabilities Act

Local governments are required to apply minimum design standards when constructing and altering pedestrian facilities, though higher than minimum standards are encouraged where possible. Design engineers and project managers are advised to review state standards at the Ohio Department of Transportation Roadway Engineering website.

More Information: Americans with Disabilities Act website  

Items of specific interest: Location and Design Manual, Volume 1 Section 300, (see section 306)  

Items of specific interest: Construction Standard Drawing BP-7.1  

    Application / Project Location

Application should be made to the District where the project applicant (local subdivision) is located. If the local subdivision is located in more than one district then the application should be made to that district in which the majority of the population resides. However, if a decennial census causes a change in the location the applicant may chose by resolution to remain in the district of which it was originally deemed to be a part.

 Ref: ORC 164.04(D)  

    Appurtenances for Safety of Animal-Drawn Vehicles, Pedestrians & Bicycles

In order to enhance the safety for animal-drawn vehicles, pedestrians and bicycles, roads and bridges may be improved to include, but are not limited to, the following:

•  Constructing or widening shoulders and widening bridges or culverts

•  Constructing pull-off lanes for roadways with visibility issues

•  Improving vertical and horizontal curvature of roadways

•  Placement of warning signs for animal-drawn vehicle traffic, including automated flashing signs

 Ref: ORC 164.16  

    Audit Requirements

OPWC-funded projects are subject to all state audit requirements. A copy of an audit in connection with and specific to an approved project must be provided to the OPWC. Any negative or adverse findings pertaining to the project must be addressed. If findings are not addressed or satisfactorily resolved, the OPWC may bar the applicant from further financial assistance until the applicant complies with or resolves such findings.

 Ref: OAC 164-1-24  

    Combination of Grant/Loan Assistance

If a Project Agreement combines grant with loan the Commission will generally pay out on the grant portion first unless the combination exceeds statutory limits for grants (i.e. 90% for repair/replacement and 50% for new/expansion). If a combination of grant/loan assistance exceeds grant statutory limits, then on each disbursement request the Commission may draw on the loan for that portion exceeding the statutory grant limit to ensure that the local share is met.

    Consulting Fees

If the Commission has determined that the scope of services and/or the associated fees are not clearly indicated, the engineer of record will be asked to clarify services with their fees. Administrative costs for application and disbursement preparation are ineligible.

    Contingency Line Item

If the Commission's Project Agreement with the local subdivision contains a contingency line item it may be used to resolve construction site problems which result in unforeseen but necessary and legitimate construction expenses. This line is not intended for engineering over-runs or right-of-way expenses. The Commission may request documentation it considers appropriate, including the subdivision's agreement with the consulting engineer. Advanced approval is required for over-runs.

    Design & Engineering Services for Townships

Ohio law requires a board of township trustees to order their county engineer to make surveys, plans, profiles, cross sections, estimates and specifications for township road improvements. A board of township trustees is permitted to enter into a contract with the county engineer under which the board agrees to pay all or any part of the cost of engineering services to be provided to or obtained for the township by the county engineer that are necessary for OPWC-funded projects. The county engineer may engage the services of a consulting engineer to perform the work. In order for the OPWC to participate in the payment of such services either a Memorandum of Understanding between the township and county, or letter from the county engineer, must be provided.

 Ref: ORC 164.15  ,  ORC 5573.01   

    Disbursements

The Commission will pay eligible project costs at its participation percentage rate up to the total amount of grant and/or loan assistance. Applicants should be prepared to meet their local share requirements at all stages of the project. At the discretion of the Commission, the participation rate can be adjusted during the course of the disbursement process but must be met prior to or by project close-out. Disbursement documentation must include detailed invoices. Payment may be made directly to the vendor or as reimbursement to the subdivision if the invoice is accompanied by proof of payment.

The Commission can only disburse funds for eligible project costs that are included in the project's scope of work as defined in Appendix A of the Project Agreement. Changes to the scope of work, including significant change orders, are the sole responsibility of the subdivision unless the District has approved a request to amend the scope.

The final disbursement request also serves as the project completion report. A separate statement of completion is not necessary if the final disbursement request indicates project completion. After the Commission is notified that a project is completed it will provide a summary of all disbursement activity.

    District Administrative Costs Program

Districts may choose to bill against their SCIP and LTIP allocations for costs incurred in administering these programs. If a district chooses to participate in this program 70% of allowable costs will be drawn from the SCIP allocation and 30% from the LTIP allocation. Each district may receive up to $65,000 per program year ($45,500 in SCIP and $19,500 in LTIP).

Reimbursement is permitted for those costs directly incurred as a result of the need for labor, materials, supplies, equipment, travel and support services to perform the committee's statutory requirements. The District Integrating Committee must approve participation in this program. Each district making this election must prepare an annual work plan and budget outlining the administrative costs to be provided and a detailed summary of administrative cost. Approval by the District Integrating Committee must be documented in its meeting minutes and supplied with this material.

 Ref: OAC 164-1-33  

    District Committee Appointments / Rosters

A District Public Works Integrating Committee is established in each of the nineteen districts. Members' terms of office are three years, with each term ending on the same day of the same month as did the term before it, except that the term may not extend beyond their terms as an elected or appointed official unless the member was appointed by a group of officials of more than one political subdivision or members of the district committee. In such case, the member's alternate continues to serve for the full term. Since initial appointments were made in 1998 the terms of committee members expire sequentially every three years (e.g. 2015, 2018, etc.), however, members may be reappointed.

The authority to make appointments to district committees varies from district to district, however all subdivisions are required to participate in the appointment of their representatives to their district committee. District committees are responsible for coordinating the appointment process in their respective districts and informing the Commission of appointments. Appointing authorities are encouraged to make their appointments prior to the expiration of the term of the incumbent appointee(s).

For the appointment of each new member and reappointment the district must provide a letter from the appointing authority or resolution. For the private member appointment the district must supply the meeting minutes documenting the committee's motion to approve.

Alternates
Appointing authorities may appoint alternates to serve in an appointed district committee member's absence to vote and participate in all meeting proceedings and actions. The alternate's term cannot exceed the term of its member with the exception noted above. Although appointments of alternates by each respective appointing authority are optional, once the appointing authority has exercised this option it may not rescind it for the duration of the member's or alternate's term. The appointing authority must provide the Commission with written documentation of the appointment including the alternate's name, address and telephone number.

A member and the alternate serve until the term expiration date or until the member's, or alternate's successor takes office or until a period of 60 days has elapsed, whichever occurs first.

Ref: ORC 164.04   ,   ORC 164.06  ,   OAC 164-1-03    

    Emergency Projects

The OPWC reserves funds for emergency infrastructure projects that arise directly out of catastrophic situations that involve an immediate threat to public health and safety, and for which there is no alternative way of addressing the project through local funding or other resources. Emergency funds are reserved on a first-come, first-serve basis. Funding requests are accepted year round by the OPWC.

Ref: ORC 164.08(B)(2)   ,   OAC 164-1-19    
More Information: OPWC Emergency page  

    Engineering Costs

Engineering costs as a percentage of construction costs are closely reviewed. Justification for elevated engineering costs may be required. Actual engineering costs incurred above the budget line item contained in the project agreement are the sole responsibility of the subdivision and will not be credited to the local contribution. Any request to amend the project budget for engineering services must be approved in writing in advance by the Commission.

    Engineer's Certified Cost Estimate

Each project application must contain a formal detailed estimate of the project's cost and be signed and stamped or sealed by a professional engineer.

 Ref: OAC 164-1-16  

    Farmland Preservation Review

Applicants must include a Farmland Preservation statement for projects that have an impact on productive agricultural and grazing land which describes both direct and indirect impacts and mitigation measures that could be implemented when alternative sites or locations are not feasible.

    Green Infrastructure

‘Green’ options to address stormwater management are eligible as an appurtenance to roadway projects and/or as part of a stormwater solution. Options include rain gardens, bio-retention (rain gardens with underdrains), vegetated curb extensions (bump-outs), bio-swales, tree box filters, and permeable sidewalks.

    Home Rule Townships – Funding Eligibility

Townships with a population in the unincorporated territory of at least 5,000 may, by procedures provided for in law, adopt limited home rule status. In addition to other powers provided for in law these townships may:

•  Construct, maintain, and finance sewer systems under certain circumstances

•  Contract with county sewer districts and regional water and sewer districts, as well as municipal corporations and private operators, to supply water and sewer services

•  Issue general obligation bonds for the costs of water supply facilities and sewer improvements

•  Hire an independent professional engineer in lieu of using the county engineer for specific road projects. (Also see Design & Engineering Services for Townships)

 Ref: ORC Chapter 504  
More Information, OPWC List of Home Rule Townships:  

    Ineligible Project Costs/Applicant's Share of Project Costs

The application can only contain the reasonable value of those engineering, right-of-way, and engineering costs that are integral to the project. Engineering costs shall not include any of the subdivision's ongoing overhead expenses for carrying out its existing engineering services.

Ineligible costs include, but are not necessarily limited to, the following:

•  Engineering: Fees above the approved engineering budget in the Project Agreement, and administration costs including fees or in-kind incurred for completing OPWC's paperwork or for securing and/or administering other funding sources

•  Legal: Mailing costs to residents for assessment hearings

•  Aesthetics: Items that strictly serve an aesthetic purpose including landscaping beyond basic post-construction repair (i.e. seeding and mulching), cost differential for decorative lighting, decorative piers, community welcome signs, water tower slogans and logos, and trees grates and tree relocation

•  Other: Trucked-in potable water for residents

 Ref: OAC 164-1-15  

    Loan Assistance / Credit Enhancements

The OPWC provides two financial tools to assist with affordability. Loan Assistance is a grant that pays for the interest on a public or private loan during the construction period, going back up to one year prior to the date of the Project Agreement. A Credit Enhancement is a one-time infusion of funds to enhance an applicant's ability to secure affordable debt. The OPWC may pay the premium for a bond insurance policy which would improve the applicant's credit or bond rating. These two funding tools may be applied for as part of a project which is also for a grant, loan or grant/loan combination but needs to be a separate application for administrative purposes.

 More Information: OPWC Loan Assistance page  

    Loans

Loan terms range from one to thirty years but cannot exceed the useful life of the project. Each district integrating committee recommends the rate of interest which ranges from zero to three percent but typically is 0%. Loans are put into billing upon project completion. Payments are due the last business day in January and July 1st for the duration of the loan. There is no prepay penalty to pay the loan in full at any time. Any loan resulting in a repayment amount equal to $5,000 or less will be invoiced as two equal payments to be repaid according to the billing cycle stated above.

If loan payments are not received within 30 days of the due date the OPWC may apply late fees, which are accrued at a rate of 8% per annum. Any loans more than 60 days late will be turned over to the Attorney General's office for collection. As provided in law, the OPWC may require that such payment be taken from the local subdivision's share of the County Undivided Local Government Fund.

 More Information: OPWC Loan page    
 Ref: ORC 164.05(C)  

    Local Capital Improvements Report

The completion of a Capital Improvements Report Summary form and the Five-Year Capital Improvement Plan / Maintenance of Effort form is at the discretion of each District Public Works Integrating Committee.

 Ref: ORC 164.06 (C)  ,   OAC 164-1-31  

    Local Match (Prepaids and In-kind)

The local match is the participation percentage rate that is made up of non-OPWC funds. It can consist of other agency funds (federal, state, or local) or local pre-paids for engineering or right-of-way, or in-kind work (labor, equipment, materials). Pre-paids may either be reimbursed (up to one year prior to the date of the Agreement), or credited toward the local match.

 Ref: ORC 164.05 (D)  
 More Information: OPWC In-kind Instructions  

    Local Transportation Improvement Program Five-Year Percentage Requirements

For every five-year period beginning July 1, 1989, at least one-third of a District's Local Transportation Improvement Program allocation must be awarded as follows:

•  42.8% for projects in municipal corporations

•  37.2% for projects in counties

•  20.0% for projects in townships except for those districts in which the combined population of townships is less than 5% of the district's total population (i.e., Cuyahoga County)

The current five-year period is July 1, 2014 - June 30, 2019 with successive periods in five-year increments.

 Ref: ORC 164.14(D)  

    Maintenance Projects

Projects that do not repair or replace infrastructure and only maintain it in a "state of good repair" are not considered a "capital improvement" as defined by the Revised Code (ORC 164.01). Projects that substantially prolong the useful life via lining or epoxy coating of structures will be considered a "capital improvement".

    Meeting Attendance

Any District committee member who fails to attend at least three-fifths of meetings for any two-year period forfeits their position on the committee.

 Ref: ORC 3.17  

    Minority Business Enterprise (MBE)

On OPWC-funded projects 15% of local subdivision direct contracts for procurement of equipment, materials, and supplies must be made from state certified MBE vendors. Projects with direct procurement will not be issued a Notice to Proceed unless evidence is provided that the MBE percentage requirement is met. Furthermore, reimbursement to local subdivisions for procured items will not be released unless evidence that the MBE percentage requirement was met.

Ref: ORC 125.081   ,   ORC 164.07;  ,   OAC 164.1-32    
More Information: MBE Certified Service Providers   

    Multi-Subdivision and Multi-District Projects / Cooperative Agreements

Any project application involving two or more subdivisions must contain a cooperative agreement between the parties.

 Ref: OAC 164-1-17  

    Open Meeting Requirements

District Public Works Integrating Committees and their subcommittees, including Small Government subcommittees and County subcommittees, are public bodies and therefore subject to Open Meeting laws as defined by section 121.22 of the Ohio Revised Code (as part of Ohio's "Sunshine Laws"). All meetings must be open to the public at all times. Teleconferencing and videoconferencing are prohibited as a member must be present in person to vote, deliberate, or to be counted in a quorum. Quorums are district-specific.

The district liaison must make public notice of the meeting at least 72 hours in advance of the scheduled meeting. Public notice consists of the day, time, place and purpose of the meeting and must be made orally, or in writing, to all members of the public body and to any person, or the news media, requesting notification. Full and accurate meeting minutes which permit the public to understand and appreciate the rationale behind the public body's decisions must be promptly prepared, filed, and maintained and be open to public inspection.

Ref: ORC 121.22   ,   ORC 164.04(D)  ,   OAC 164-1-10    
More Information: AG website, Ohio’s Sunshine Law Manual 

    OPWC Project Signs

A local subdivision is not required to post signage on an OPWC funded project but if it does it must follow a standardized layout designed to increase public awareness through signage repetition. OPWC will participate in the cost of the signage and reimburse the local subdivision on the project's applicable disbursement ratio based on a photo of the sign and invoice. OPWC projects jointly funded with other state or federal funding agencies which have other signage requirements are exempt from the standardized layout.

 More Information: OPWC Sign specifications page  

    Ohio Products

All projects, to the extent practicable, must use Ohio products, materials, services and labor.

 Ref: ORC 164.05(A)(6)  

    Prevailing Wage and Other Bidding Requirements

The OPWC requires that all state and local bidding laws and requirements be followed including the payment of state prevailing wages. An exception applies if the project is jointly funded with federal money in which case federal laws override state requirements. The OPWC has provided bid proposal notes (see link below) which contain the necessary state requirements. Questions should be directed to the local subdivision's legal counsel.

 More Information: OPWC Project Manager page  

    Procurement of Professional Design Services

Ohio law requires all public authorities to use a Qualifications-Based Selection (QBS) process in choosing professional design services (i.e. architect, landscape architect, professional engineer, and surveyor) or design-build services. Public authorities are required to take the following steps:

•  Publicly announce all contracts giving sufficient time for firms to submit a statement of qualifications

•  Evaluate and rank the submissions

•  Negotiate a contract with the firm ranked most qualified to perform the required services at a compensation determined in writing to be fair and reasonable to the public authority

Prescribed legal selection, negotiation, and contracting procedures do not have to be followed if the project is determined in writing to be an emergency necessitating immediate action, or if the design fee is less than $50,000 and both of the following requirements are met:

•  The public authority selects a single design professional or firm from among those who submitted a statement of qualifications within the immediately preceding year

•  The public authority and selected design professional or firm enter into contract negotiations in compliance with the law

The Commission requires that subdivisions enter into a project specific contract, signed by both parties, that delineates the type of billing and payment method. All contracts must contain the following sections:

•  Scope of Services specifying what the consultant engineer will provide including such items as: tasks to be performed, schedule for performance, deliverables, review procedures, and number of reports to be delivered

•  Contracting Method (fixed price, time and materials, or cost plus fixed fee)

•  Contract Terms and Conditions such as contract period, key personnel, subcontracting provisions, penalties, change in scope, termination rights, method of payment and amendment provisions

The Commission may request evidence of compliance with these procedures including evidence of QBS, as well as a copy of the contract between the local subdivision and its professional design firm.

 Ref: ORC Sections 153.65 to 153.73  
 More Information: American Council of Engineering Companies of Ohio website  

    Project Agreement

Once a project agreement is released by the OPWC, it must be signed and returned within 45 days. An executed project agreement is required prior to the disbursement of funds.

 Ref: OAC 164-1-21  

    Project Cost Overruns and Under-runs / Supplemental Funding

All project cost overruns are the sole responsibility of the project applicant. Any surplus in assistance resulting from a project cost under-run will be returned to the originating District. However, a project applicant may request under-run monies from its District for completing a project. District meeting minutes are required for the OPWC to amend the Project Agreement accordingly.

 Ref: OAC 164-1-23  

    Project Phases

A project may only be funded once during its design life. However, projects may be divided into phases to make them more affordable including breaking a project into design only with or without right-of-way and construction phases. Design only projects are contingent upon meeting the construction schedule provided in the application. Failure to meet the construction schedule may cause the OPWC to require that the recipient return all OPWC funds disbursed for engineering and right-of-way.

    Project Schedule

Project applications with delayed schedules for engineering, bidding and construction will be questioned and possibly returned for resubmission in a future program year if they will not proceed during the current program year. Generally, projects must be scheduled to be under construction by the end of the state fiscal year (June 30th) for the program year in which the agreement is released, and must be completed within two years of the agreement release.

Projects that are being sold by the Ohio Department of Transportation ("ODOT-let") must use the ODOT sale date. Such project schedules are confirmed with ODOT and will be rejected by the Commission if scheduled into a future program year.

Project schedules are monitored by the OPWC. Failure to meet the project schedule may result in termination of the agreement for approved projects. Projects delayed for reasons which are beyond the control of the subdivision or could not be foreseen or anticipated may, at the discretion of the Commission, receive a schedule extension. Extension requests with the reason for the delay must be made in writing. Projects with delayed schedules that lend themselves to a future funding year may be terminated.

    Public Improvements / Right of Way

All Commission funded work must be owned and maintained by a local subdivision. Work not on public property or right of way, including water and sewer laterals, are ineligible for Commission assistance.

    Public Records

It is the policy of the OPWC to strictly adhere to the State's Public Records Act. All exemptions to openness are to be construed in their narrowest sense and any denial of public records in response to a valid request must be accompanied by an explanation, including legal authority, as outlined in the Ohio Revised Code. If the request for public records is written, the explanation of denial must also be written.

Records are defined as including the following: any document - paper, electronic (including but not limited to e-mail), or other format - that is created or received by, or comes under the jurisdiction of a public office that documents the organization, functions, policies, decisions, procedures, operations, or other activities of this office. All records of the OPWC are public unless they are specifically exempt from disclosure under the Ohio Revised Code. Records will be organized and maintained so that they are readily available for inspection and copying, and available according to OPWC's record retention policy.

Requests & Responses
Each request for public records should be evaluated for a response using the following guidelines:

Identification of Public Records Requested - The requester must identify the records requested with sufficient clarity to allow the OPWC to identify, retrieve, and review the records. If it is not clear what records are being sought, the OPWC will contact the requester for clarification, and should assist the requester in revising the request by informing the requester of the manner in which the Commission keeps its records.

Method of Request & Identity of Requester - The requester does not have to put a records request in writing, and does not have to provide his or her identity or the intended use of the requested public record.

Availability of Public Records for Inspection & Production of Copies - Public records are to be available for inspection during regular business hours, with the exception of published holidays. Public records must be made available for inspection promptly. Copies of public records must be made available within a reasonable time period. "Prompt" and "reasonable" take into account the volume of records requested, the proximity of the location where the records are stored, and the necessity for any legal review of the records requested.

Time Constraints for Satisfying Public Records Request - Each request should be evaluated for an estimated length of time required to gather the records. If feasible, routine requests for records should be satisfied immediately. Routine requests included, but are not limited to, meeting minutes (both in draft and final form), budgets, salary information, forms and applications, personnel rosters, etc. If fewer than 20 pages of copies are requested or if the records are readily available in an electronic format that can be e-mailed or downloaded easily, these should be made as quickly as the equipment allows.

All requests for public records must either be satisfied or be acknowledged in writing within three business days following receipt of the request. If a request will not be satisfied within three business days, the acknowledgment must include at least a request for clarification, if necessary, and an estimated cost if copies are requested.

Denial of Public Records Request - Any denial of public records requested must include an explanation, including legal authority. If portions of a record are public and portions are exempt, the exempt portions are to be redacted and the rest released. If there are redactions, each redaction must be accompanied by a supporting explanation, including legal authority.

Cost for Obtaining Copies of Public Records
Charges for public records are for the actual cost of making copies as follows:

•  Paper copies are 5 cents per page

•  Downloaded computer files to a compact disc (CD) are $1 per disc

•  No charge for e-mailed documents

•  If the requester asks that the documents be mailed there is a charge for the actual cost of postage and mailing supplies

E-Mail as Public Records
E-mail is to be treated in the same fashion as records in other formats and should follow the same retention schedule. Records in private e-mail accounts used to conduct public business are subject to disclosure, and all employees or representatives of the OPWC are instructed to retain their e-mails that relate to public business and to copy them to the business e-mail accounts.

Failure to Respond to a Public Records Request
The OPWC recognizes the legal and non-legal consequences of failure to properly respond to a public records request. In addition to the distrust in government that failure to comply may cause, it may also result in a court ordering the public office to comply with the law and to pay the requester's attorney's fees and damages.

 Ref: ORC 149.43  
 More Information: AG website, Ohio’s Sunshine Law Manual 

    Records Retention

For every project approved by the Commission, a "project folder" is created for project management purposes. This folder is in a paper format and contains such items including the original project application, Project Agreement, disbursement records, Requests to Proceed, and general correspondence. Project related information that is stored electronically includes the Project Agreement, a list of all approved vendors or each project and their respective contract amounts, a list of all vendors paid by the Commission, and the dollar amount paid.

The Commission will maintain completed project folders for a period of two years after audit of the OPWC by the Auditor of State's Office. After the two-year period has past, project folders will be scheduled for destruction. In addition, all other public records, including e-mails, will be maintained according to a two-year period retention schedule.

It is strongly recommended that District Public Works Integrating Committees retain those documents pertaining to a specific program year’s slate of projects for a period of two years after the recommendations are forwarded to OPWC. This includes unfunded applications, district minutes, and any other documentation related to a particular program year.

 Ref: ORC 149.33   ,  DAS Directive GS-D-04  

    Repair/Replacement vs. New/Expansion Projects

Grants under the State Capital Improvement Program cannot exceed 90% of the total project cost for repair/replacement projects, and no more than 50% for new/expansion projects.

No project will be accepted that solely eliminates existing infrastructure, nor shall a project be accepted that replaces existing infrastructure with that which has a designed service capacity substantially less than the designed service capacity of the existing infrastructure.

 Ref: ORC 164.05(D)   ,  OAC 164-1-14  

    Requests to Proceed

A Request to Proceed is required for all project prime contractors and for the direct procurement by the local subdivision of materials, supplies, or services including engineering. Construction cannot begin until the local subdivision has received a "Notice to Proceed" from the OPWC.

More Information: OPWC Project Manager page  

    Small Government

District Integrating Committees may select from their unfunded projects, applications to submit to the Small Government Commission for consideration for funding. The Small Government Program provides grants and loans to villages and townships with populations in the unincorporated areas of less than 5,000 in population. Districts may submit up to seven applications for consideration. All seven must be ranked, however, only the top five will be scored. The remaining two will be held should an application be withdrawn, or if needed to retain program competitiveness. If the program is not competitive, all sixth- ranked projects will be scored. If the program remains uncompetitive, all seventh- ranked projects will be scored. Policies of the Small Government Commission are retained under separate cover on OPWC's web site as part of the Small Government Methodology.

Ref: ORC 164.02(C)(1)   ,   ORC 164.051  ,   ORC 164.06(D)  ,   ORC 164.08(B)(1)    
More Information: OPWC Small Government page  

    Standalone Eligibility

Projects that are eligible as 'standalone' or rather independent of any other project components include ADA curb ramps, signalization, audible crossing signals, railroad crossing grade, fire hydrants, signage, guardrail, and security for drinking water facilities. Water and sewer laterals are also eligible as either standalone or as a component of a larger project; however, such an improvement must involve an easement between the homeowner and the local subdivision.

Projects that are ineligible as 'standalone' are those not specific to the roadway including sidewalks, bike paths and street lighting.

    Subdivision Applicant Codes

The Commission uses a unique code to identify applicants, determine their eligibility to receive funding and to manage and track project information. This code is to be provided on page 1 of the Application for Financial Assistance. Subdivision codes are assigned by the Commission at the written request of the applicant on the entity's letterhead.

    Unlawful Interest in Public Contracts

Public officials are prohibited from having a public interest in any public contract associated with their public office during public employment or for 12 months thereafter. Members of district integrating committees may not be compensated for personal or professional services provided, through contract or employment, for any project considered for Commission funding by their district committee. However, a committee member does not have an unlawful interest in a public contract solely by virtue of the receipt of financial assistance from the OPWC by that member's local subdivision.

Ref:  ORC 164.04(F)   ,  ORC 2921.42(A)(1)  

    Useful Life / Designed Service Capacity

The minimum useful life of any infrastructure project is seven years in accordance with generally accepted engineering principles and practices. A useful life statement must be included in the project application and be stamped / sealed and signed by a licensed professional engineer.

More Information: OPWC Project Manager page  

A district's annual selection of projects must ensure on a dollar-weighted basis that the individual slates for State Capital Improvement projects, Revolving Loan projects, and Local Transportation Improvement projects in their entirety have an approximate useful life of at least twenty years.

 More Information: District Weighted Useful Life Calculation Worksheet  
 Ref: ORC 164.05(J)   ,   ORC 164.14(C)  ,   OAC 164-1-13